Pneumatic equipment (air panel) completion, delivery, and maintenance.
The design takes maintenance into consideration, allowing for easy replacement of the filter element without the need to remove other equipment or piping tubes.
We are also open to discussing delivery methods. The design takes maintenance into consideration, allowing for easy replacement of the filter element without removing other equipment or piping tubes. Depending on the size of the panel, the estimated time from design to delivery is about 2 weeks to 1 month.
- Company:タイコー技研
- Price:Other